New electrical consumers such as charging points for electric vehicles or heat pumps can overload the low-voltage grid when operated at the same time — a risk that increases as these technologies become more widespread. With the new §14a EnWG, the legislator enables affected network operators to reduce available power in the event of a demonstrably imminent bottleneck. In return, the subscriber benefits from a reduced network fee.
Read more on 50komma2.de